Kitchen Remodeling in Seattle & Tacoma

We build full kitchen remodels across Seattle, Tacoma, and Bellevue — cabinetry, countertops, lighting, and appliance integration on a fixed written scope. Most Seattle-area kitchen remodels run $40,000-$100,000+ and take 6-12 weeks on site.

Remodeled Seattle kitchen with custom cabinetry and island

Where the money actually goes

Cabinetry is the single largest line in nearly every kitchen we build, followed by countertops and then labor for anything that moves. Keeping the sink and range where they are keeps the number in the lower half of the range; relocating plumbing or gas, opening a wall, or reworking the panel moves it up. We show you which decision costs what before you commit, so the budget is a set of choices instead of a surprise.

Older Puget Sound houses, honest scoping

Much of the region's housing stock predates modern kitchen electrical loads. When we open walls in a 1920s Ballard bungalow or a 1960s Tacoma rambler, we regularly find undersized circuits, no dedicated appliance runs, or plumbing that will not pass inspection as-is. We look for that during the assessment and price it in writing rather than discovering it mid-project and issuing a change order.

A layout built around how you actually cook

Before cabinets are ordered we walk the work triangle with you: where groceries land, where prep happens, where the trash goes, whether two people cook at once. Small moves — a wider aisle, a deeper prep run, drawers instead of base doors — decide whether the kitchen feels right for the next fifteen years. That planning happens on paper, where changes are free.

What a kitchen remodeling project includes

Typical scope on a 6-12 weeks project. Anything outside it is listed as a written exclusion in your proposal.

  • Demolition and disposal
  • Cabinetry layout, ordering, and installation
  • Countertop templating and installation
  • Electrical brought to current code, including dedicated appliance circuits
  • Plumbing rough-in and fixture installation
  • Backsplash and tile work
  • Lighting plan: task, ambient, and under-cabinet
  • Appliance integration and hookup
  • Permit handling and inspections
  • Final walkthrough and punch list

How we run a kitchen remodeling project

The same sequence on every job, so you always know what happens next.

  1. 01

    Free in-home assessment

    We measure, check the panel and plumbing, and talk through how you cook.

  2. 02

    Fixed-price proposal

    Scope, allowances, exclusions, and schedule in writing before anything is ordered.

  3. 03

    Layout and selections

    Cabinet drawings, counters, tile, and fixtures chosen against real product pricing.

  4. 04

    Permits

    Pulled under our license whenever plumbing, gas, or electrical moves.

  5. 05

    Demo and rough-ins

    Electrical and plumbing brought to code and inspected before anything closes up.

  6. 06

    Cabinets and counters

    Cabinets set and leveled, then counters templated off the installed boxes.

  7. 07

    Tile, lighting, appliances

    Backsplash, fixtures, and appliance hookup in the right order.

  8. 08

    Walkthrough and warranty

    Cleaned, punch-listed, and handed over with our workmanship warranty.

Our Seattle–Tacoma guarantees

Written commitments that apply to every kitchen remodeling project we take in King and Pierce counties.

  • Fixed price with written exclusions — the number you sign is the number you pay.
  • Permits pulled under our Washington contractor license, inspections managed by us.
  • Workmanship warranty in writing, plus manufacturer warranties registered in your name.
  • One point of contact for the whole build, Mon-Fri, 8am-5pm PT.
  • Daily cleanup and dust containment — you keep living in the house.

Kitchen Remodeling FAQ

How much does a kitchen remodel cost in Seattle?
Most full kitchen remodels in the Seattle-Tacoma area run $40,000-$100,000+, depending on cabinetry, countertops, and whether the layout changes. We provide a fixed scope and price before work begins.
How long will my kitchen be out of service?
Plan on 6-12 weeks on site for a full remodel. We set up a temporary kitchen area before demo and tell you the specific weeks the sink and range are unavailable.
Do you handle permits for a kitchen remodel?
Yes. When plumbing, gas, or electrical moves — which most full kitchen remodels involve — we pull the permit under our license and manage the inspections.

Ready to price your kitchen remodeling project?

Free estimate, fixed written scope, licensed and insured. We respond within 2 business hours, Mon–Fri, 8am–5pm PT.