+1 (206) 536-8410Free Estimate

Home Remodeling in Seattle

We remodel bathrooms and kitchens across Seattle on a fixed written scope. A full Seattle bathroom remodel generally runs $20,000-$50,000 and takes 4-8 weeks on site; a tub-to-shower conversion is 1-3 weeks. Kitchens run $40,000-$100,000+ over 6-12 weeks.

Seattle houses are rarely square, rarely dry, and almost never wired for how people live now. We plan around that before demo day instead of discovering it on week three.

Seattle remodeling at a glance

What we run into in Seattle homes

Craftsman and bungalow bathrooms

Ballard, Wallingford and Beacon Hill are full of early-century houses with small, single-bathroom floor plans and original framing. Once the tile comes off we usually find undersized joist bays, old galvanized supply lines, or a floor that slopes toward the tub. We look for those conditions during the walkthrough and price them in writing rather than issuing a change order later.

Mid-century and split-level kitchens

Post-war Seattle neighborhoods put the kitchen in a closed room with one window and one circuit. Opening it up is usually a framing and electrical question before it is a cabinet question, and that is where the budget separates a $40,000 kitchen from a $100,000 one.

Wet-climate detailing

Everything we build in Seattle assumes water will find it: bonded waterproofing membranes in showers, ventilation sized for the room and ducted outside, and flooring chosen for a house that stays damp from October to May.

Areas of Seattle we work in

  • Ballard
  • West Seattle
  • Queen Anne
  • Green Lake
  • Wallingford
  • Beacon Hill
  • Columbia City
  • Magnolia

Seattle remodeling questions, answered

How much does a bathroom remodel cost in Seattle?
Most full bathroom remodels in Seattle run $20,000-$50,000 depending on size, tile, and fixtures, and take 4-8 weeks on site. A tub-to-shower conversion is a smaller scope at 1-3 weeks. We put the number in writing as a fixed scope before demo begins.
Do you pull permits for Seattle remodels?
Yes. When the scope requires a permit we handle the permit process and the inspections as part of the project.
Which Seattle neighborhoods do you work in?
We work throughout Seattle, including Ballard, West Seattle, Queen Anne, Green Lake, Wallingford, Beacon Hill, Columbia City and Magnolia, plus the rest of King County.
Can I stay in the house during a Seattle bathroom remodel?
Most clients do. We set up dust containment, protect the path to the work area, and clean daily. If the house has only one bathroom we tell you up front which days it is out of service.
How long does a Seattle kitchen remodel take?
Plan on 6-12 weeks on site once cabinetry has arrived. Layout changes, electrical upgrades and stone lead times are what move a Seattle kitchen toward the long end.

Ready to Start?

Free estimate, fixed written scope. No surprise invoices. We respond within 2 business hours.

Get Your Free Estimate+1 (206) 536-8410

Text or call — we respond within 2 business hours