+1 (206) 536-8410Free Estimate
Pacific Northwest craftsman home remodel by NorthWest Home Remodeling
Trending 2026: Kitchens · Bathrooms · Whole-Home Remodels

Your Home.
Our Craft.
Pacific Northwest
Built.

Seattle–Tacoma's go-to general contractor for kitchen & bath remodels, home additions, home remodeling, & full construction. Licensed, bonded, insured — and we actually answer our phone.

WA Licensed & Bonded
199+Projects Completed
WA State LicensedBonded & Insured199+ Projects CompletedServing Seattle–Tacoma
WA State LicensedBonded & Insured199+ Projects CompletedServing Seattle–Tacoma
Trending in the Pacific Northwest

What Seattle Homeowners Are Building Right Now

Two things dominate our 2026 calendar: full-scope kitchen remodels and down-to-studs whole-home renovations. We're booked solid on both — and we'll tell you straight if the scope pencils for your home.

Kitchen Remodels
Booking Fast
$65k
avg. Seattle kitchen

Kitchen Remodels

Custom cabinetry, quartz countertops, and layouts that actually work. Our 2026 kitchens run $40k–$100k+ with fixed pricing before demo begins.

Learn more about Kitchen Remodels
Whole-Home Renovations
In Demand 2026
6–9 mo
typical timeline

Whole-Home Renovations

Down-to-studs remodels with new electrical, plumbing, and insulation — designed for how you actually live. Fixed scope and price before we swing a hammer.

Learn more about Whole-Home Renovations
Also trending:
Whole-home electrification
Passive house upgrades
Chef-grade kitchen islands

What We Do

From foundation to finish, we handle every aspect of your construction or remodeling project.

General Construction

General Construction

New builds, additions, and structural work built to withstand Pacific Northwest conditions.

Learn more about General Construction
Home Remodeling

Home Remodeling

Full-home renovations that respect your home's character while modernizing every detail.

Learn more about Home Remodeling
Kitchen Remodeling

Kitchen Remodeling

Custom cabinetry, countertops, islands, and appliance integration for the heart of your home.

Learn more about Kitchen Remodeling
Bathroom Remodeling

Bathroom Remodeling

Walk-in showers, custom tile, accessibility features, and fixtures that last.

Learn more about Bathroom Remodeling
Deck & Outdoor Living

Deck & Outdoor Living

Trex decking, pergolas, and outdoor kitchens designed for Seattle's rain and your lifestyle.

Learn more about Deck & Outdoor Living
Basement Finishing

Basement Finishing

Guest suites, home offices, and entertainment rooms. Turn unused space into your favorite room.

Learn more about Basement Finishing
View All Services

Planning a bump-out or second story? Read our 2026 home addition cost guide for Seattle.

Featured Projects

View All Projects
Modern Craftsman Kitchen
Kitchen

Modern Craftsman Kitchen

Bellevue, WA

Spa-Inspired Master Bath
Bathroom

Spa-Inspired Master Bath

Kirkland, WA

Covered Deck Retreat
Outdoor

Covered Deck Retreat

Issaquah, WA

What Pacific Northwest Homeowners Say

"They completely transformed our 1970s kitchen into a modern masterpiece. On time, on budget, and the crew was incredibly respectful of our home. We've already recommended them to three neighbors."

Sarah M.

Bellevue, WA · Kitchen Remodel

Why Pacific Northwest Homeowners Choose Us

Licensed & Transparent

WA State licensed, bonded, and insured. We provide detailed estimates — no hidden fees, no surprise change orders.

Pacific Northwest Sustainability

Low-VOC paints and energy-efficient upgrades built for Pacific Northwest weather and long-term durability.

We Show Up. On Time.

Digital project tracking, 2-hour response time, and a dedicated project manager. We respect your schedule and your home.

Frequently Asked Questions

Straight answers on cost, timelines, rebates, and how we work.

How much does a kitchen remodel cost in Seattle?
Most full kitchen remodels in the Seattle and Tacoma area run from about $40,000 to $100,000 or more, depending on size, cabinetry, countertops, and whether the layout changes. We provide a fixed scope and price up front.
How much does a bathroom remodel cost?
A full bathroom remodel typically ranges from about $20,000 to $50,000 or more depending on size, fixtures, and tile work. We provide a detailed, fixed estimate before work begins.
Are you licensed, bonded, and insured?
Yes. NorthWest Home Remodeling is a licensed, bonded, and insured general contractor in Washington State.
Do you handle permits?
Yes. For remodels and additions that require permits, we manage the permitting and inspections as part of the project.
What areas do you serve?
We serve the greater Puget Sound region, including Seattle, Tacoma, Bellevue, Renton, Kent, and surrounding communities.

Ready to Start?

Free estimates. No surprise invoices. Licensed and insured, always. We respond within 2 business hours.

Get Your Free Estimate+1 (206) 536-8410

Text or call — we respond within 2 business hours